Aisle of server racks in a data center

Services

Data Center Logistics

Servers, racks and critical power gear moved strapped, braced and secured to a written plan.

Built for equipment that cannot take a hit

Servers, storage arrays, network gear, UPS systems and switchgear are heavy for their size, top-heavy in a rack, and sensitive to shock and vibration.

Each shipment gets a written securement plan and equipment chosen for the freight, and the paperwork records the condition at pickup and delivery.

Freight
Racks, servers, storage, network, power and cooling gear
Securement
Strapped, braced and blocked to a written plan
Security
GPS where equipped, seals and photos at each handoff

Securement

Strapped, braced, secured, documented.

Strapped

Rated straps at the points the manufacturer allows, with edge protection on every strap contact point.

Braced

Blocked and braced so freight cannot shift; racks kept upright with tip-over protection.

Secured

Shock and tilt indicators on request; seal numbers recorded at pickup and checked at delivery.

Documented

Photos before sealing; seal, time and signature at every handoff; POD and photos at delivery.

How a move runs

From site survey to sign-off.

  1. 01

    Scope the move

    Equipment list, weights, rack ratings and site access at both ends.

  2. 02

    Write the plan

    Equipment, securement, route and stops, shared with your team before we commit.

  3. 03

    Load and seal

    The driver secures the freight to plan. We photograph the load and record the seal number.

  4. 04

    Run and deliver

    Tracked on the Freightrix where equipped, closed with a signed POD.

Questions

Straight answers

Can you move racked servers?

We review rack ratings, weight and center of gravity with you before we quote, and plan the securement around them. Whether a rack ships loaded or empty depends on the manufacturer's transport rating and your sign-off.

What security do you add for high-value hardware?

A written route plan with planned stops only, numbered seals checked at each handoff, and photos before sealing and at delivery.

Do you handle both ends of a decommission?

We coordinate pickup at the outgoing site and delivery to the new site or to an IT asset disposition (ITAD) facility, with signed handoffs at each step.

How is the freight tracked?

Loads run on the Freightrix, our visibility platform, with GPS where equipped and a dispatcher watching for exceptions.

Ready to ship?

Tell us about the lane, the freight, and the deadline. We'll come back with equipment, transit, and price.